Time and Work Test

Number of questions:10

Q.1 A and B can do a piece of work in 45 days and 40 days respectively. They began to do the work together but A leaves after some days and then B completed the remaining work in 23 days. The number of days after which A left the work was 11



Q.2 Two pipes can fill a tank in 20 and 24 minutes respectively and a waste pipe can empty 3 gallons per minute. All the three pipes working together can fill the tank in 15 minutes. The capacity of the tank in gallons is



Q.3 39 persons can repair a road in 12 days, working 5 hours a day. In how many days will 30 persons, working 6 hours a day, complete the work?



Q.4 Water flows into a reservoir which is 200 m long and 150 m wide, through a pipe of cross-section (0.3m X 0.2m) at 20kmph. In what time will the water level be 8?



Q.5 A work is done by three person A,B and C. A alone takes 10 hours to complete a single product but B and C working together takes 4 hours, for the completion of the same product. If all of them worked together and completed 14 products, then how many hours have they worked?



Q.6 Four men and three women can do a job in 6 days. When five men and six women work on the same job, the work gets completed in 4 days. How many days will a woman take to do the job, if she works alone on it?



Q.7 A pump can be used either to fill or to empty a tank. The capacity of the tank is 3600m3. The emptying capacity of the pump is 10m3/min higher than its filling capacity. What is the emptying capacity of the pump if the pump needs 12 more minutes to fill the tank than to empty it?



Q.8 Working together, A and B can do a job in 6 days. B and C can do the same job in 10 days, while C and A can do it in 7.5 days.
How many days will it take if all A, B and C work together to complete the job?



Q.9 Working together, A and B can do a job in 6 days. B and C can do the same job in 10 days, while C and A can do it in 7.5 days.
How many days will it take for A alone to complete the job?



Q.10 Anil does a work in 90 days, Bittu in 40 days and Chintu in 12 days. They work one after another for a day each, starting with Anil followed by Bittu and then by Chintu. If the total wages received are Rs 360 and Anil, Bittu, Chintu share them in the ratio of the work done, find their respective individual wages.