Warning: include(): https:// wrapper is disabled in the server configuration by allow_url_include=0 in /home/illumina/public_html/company/ipmatQ/index.php on line 28

Warning: include(https://illuminateminds.com/includes/headscripts.php): Failed to open stream: no suitable wrapper could be found in /home/illumina/public_html/company/ipmatQ/index.php on line 28

Warning: include(): Failed opening 'https://illuminateminds.com/includes/headscripts.php' for inclusion (include_path='.:/opt/remi/php84/root/usr/share/pear:/opt/remi/php84/root/usr/share/php:/usr/share/pear:/usr/share/php') in /home/illumina/public_html/company/ipmatQ/index.php on line 28
IPMAT Quants Questions




Jobs By Batch
Jobs By Location
Jobs By Degree
Jobs By Branch
IT Jobs
Internships
Govt. Jobs
Adimissions











Warning: include(): https:// wrapper is disabled in the server configuration by allow_url_include=0 in /home/illumina/public_html/company/includes/sidebar.php on line 247

Warning: include(https://illuminateminds.com/TyariOnline/includes/placement.php): Failed to open stream: no suitable wrapper could be found in /home/illumina/public_html/company/includes/sidebar.php on line 247

Warning: include(): Failed opening 'https://illuminateminds.com/TyariOnline/includes/placement.php' for inclusion (include_path='.:/opt/remi/php84/root/usr/share/pear:/opt/remi/php84/root/usr/share/php:/usr/share/pear:/usr/share/php') in /home/illumina/public_html/company/includes/sidebar.php on line 247



Warning: include(): https:// wrapper is disabled in the server configuration by allow_url_include=0 in /home/illumina/public_html/company/includes/sidebar.php on line 250

Warning: include(https://illuminateminds.com/TyariOnline/includes/randomlinks.php): Failed to open stream: no suitable wrapper could be found in /home/illumina/public_html/company/includes/sidebar.php on line 250

Warning: include(): Failed opening 'https://illuminateminds.com/TyariOnline/includes/randomlinks.php' for inclusion (include_path='.:/opt/remi/php84/root/usr/share/pear:/opt/remi/php84/root/usr/share/php:/usr/share/pear:/usr/share/php') in /home/illumina/public_html/company/includes/sidebar.php on line 250









Q #11
⏰ :


Warning: Undefined array key "subtitle" in /home/illumina/public_html/company/ipmatQ/index.php on line 174
Quants Question

Directions: Refer the following data to answer the questions given below.

A trader sells 10 litres of a mixture of paints A and B, where the amount of B in the mixture does not exceed that of A. The cost of paint A per litre is Rs. 8 more than that of paint B. If the trader sells the entire mixture for Rs. 264 and makes a profit of 10%, then the highest possible cost of paint B, in Rs. per litre, is

Warning: Undefined array key 4 in /home/illumina/public_html/company/ipmatQ/index.php on line 282
+


Q #12
⏰ :


Warning: Undefined array key "subtitle" in /home/illumina/public_html/company/ipmatQ/index.php on line 435
Quants Question

Directions: Read the following information to answer the question.

Three pipes A,B and C are connected to a tank. These pipes can fill the tank separately in 5hr, 10 hr and 15hr respectively. When all the three pipes were opened simultaneously, it was observed that pipes A and B were supplying water at (3/4)th of their normal rates for the 1st hour after which they supplied water at normal rate. Pipe C supplied water at (2/3)rd of its normal rate for 1st 2 hour, after which it supplied at its normal rate. In how much time, tank would be filled?

Warning: Undefined array key 4 in /home/illumina/public_html/company/ipmatQ/index.php on line 544
+

Solution:

The part of the tank filled by A and B in first two hour

⇒ 3/4×(1/5+1/10)+(1/5+1/10)

The part of tank filled by C in first two hours =2×2/3×1/15

Remaining part =139/360

In 1 hour, all the three pipes together will fill =11/30

 

Hence, the time taken to fill the remaining tank =139/360×30/11=1.0530 hour.

Thus, the total time taken to fill the remaining tank = 3.05 hour.


Q #13
⏰ :


Warning: Undefined array key "subtitle" in /home/illumina/public_html/company/ipmatQ/index.php on line 694
Quants Question

Directions: Read the following information to answer the question.

Three professors Dr. Gupta, Dr. Sharma, Dr. Singh are evaluating answer script of a subject. Dr. Gupta is 40% more efficient than Dr. Sharma, who is 20% more efficient than Dr. Singh. Dr. Gupta takes 10 days less than Dr. Sharma to complete the evaluation work. Dr. Gupta starts the evaluation work and works for 10 days and then Dr. Sharma takes over. Dr. Sharma evaluates for next 15 days and then stops. In how many days, Dr. Singh can complete the remaining evaluation work?

Warning: Undefined array key 4 in /home/illumina/public_html/company/ipmatQ/index.php on line 803
+

Solution:

As per the information given, the ratio of efficiencies of Dr. Gupta, Dr. Sharma and Dr. Singh are 42:30:25

Hence, the ratio of time taken by Dr. Gupta and Dr. Sharma =5:7

Dr. Gupta takes 10 days less than Dr. Sharma, time taken by them will be 25 days and 35 days respectively.

Hence, time taken by Dr. Singh will be 42 days.<br>Part of work completed by Dr. Gupta =2/5

Part of work completed by Dr. Sharma =3/7

Remaining work =1−(2/5+3/7)=6/35

 will be completed by Dr. Singh

He can complete it in 42×6/35

= 7.2 days.


Q #14
⏰ :


Warning: Undefined array key "subtitle" in /home/illumina/public_html/company/ipmatQ/index.php on line 954
Quants Question

Directions: Read the following information to answer the question.

Pipe A can fill a tank in 12 hours. When it works along with Pipe B, it can fill the tank in 8 hours. In how many hours can pipe B fill the same tank independently (in hours)?

Warning: Undefined array key 4 in /home/illumina/public_html/company/ipmatQ/index.php on line 1063
+

Let the capacity of the tank be C.
Rate of Pipe A = C/A  
Rate of Pipe B = C/B  
Rate of Pipe A and Pipe B together = C/A + C/B = C/8  

 C/12 + C/B   = C/8  
C/B   = C/8 – C/12 = C/24  
Pipe B independently will take 24 hours to fill the tank.


Q #15
⏰ :


Warning: Undefined array key "subtitle" in /home/illumina/public_html/company/ipmatQ/index.php on line 1213
Quants Question

Directions: Read the following information to answer the question.

A and B start from two points P and Q respectively with uniform velocities. A is headed towards Q and B towards P. P and Q are separated by a distance of 2000 km. A rests whenever B is on the move and B rests whenever A is on the move. A’s speed is 40 km/hr. If A starts first and reaches the destination in 60 hrs, then find the least time that B would take to reach his destination after A makes a start, given that B’s speed is 50 kmph.

Warning: Undefined array key 4 in /home/illumina/public_html/company/ipmatQ/index.php on line 1322
+

A should take = 2000/40 = 50 hrs.

    If he is taking 60 hrs means he is taking 10 hrsrest;

    in that 10 hrs B would have travelled = 500 km

    1500/50 = 30 hrs;

    60 + 30 = 90 hrs